January, 1989
Hindsight | Insight | Foresight
January, 1989
This is a repeating eventJan 20 2020
A semi-submersible rig had a gas kick at 15,527 feet during an attempt to clear the drill pipe of cement previously pumped in to control the well, and the well
A semi-submersible rig had a gas kick at 15,527 feet during an attempt to clear the drill pipe of cement previously pumped in to control the well, and the well then suffered a blow-out. It was stabilized after 11 months by pumping heavy mud down a relief well and was later sealed.
[ Property Damage $220 Million. Estimated Current Value $495 Million ]
Image credit: Saga Petroleum